Framing Prefabrication BIM Modeling

LOD 400 wall assemblies, ceilings, Pods, etc., carefully coordinated with all trades. By building more components offsite, we can increase the efficiency and keep time and costs down during construction. 

Search results for "". Page 1 of 1, Results 1 to 2 of 2
Title Date Sort descending Department
Reset
MEP Modeler
MEP Modeler AR Apr 15, 2024
Apr 15, 2024 Framing Prefabrication BIM Modeling
Electrical BIM Specialist
Electrical BIM Specialist AR Apr 9, 2024
Apr 9, 2024 Framing Prefabrication BIM Modeling